<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Building Inspection Archives - IPM</title>
	<atom:link href="https://ipm.my/tag/building-inspection/feed/" rel="self" type="application/rss+xml" />
	<link>https://ipm.my/tag/building-inspection/</link>
	<description>Architectural, Engineering, Master Planning, Cost Planning</description>
	<lastBuildDate>Wed, 26 Mar 2025 13:16:06 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.7.5</generator>
	<item>
		<title>Joint Building Inspection with DBKL Officer at KLCC District Cooling Plant (DCC2)</title>
		<link>https://ipm.my/joint-building-inspection-with-dbkl-officer-at-klcc-district-cooling-plant-dcc2/</link>
		
		<dc:creator><![CDATA[IPM]]></dc:creator>
		<pubDate>Wed, 19 Mar 2025 08:07:00 +0000</pubDate>
				<category><![CDATA[Events]]></category>
		<category><![CDATA[Building Inspection]]></category>
		<category><![CDATA[Engineering]]></category>
		<category><![CDATA[Engineering Consultancy]]></category>
		<category><![CDATA[IPM]]></category>
		<guid isPermaLink="false">https://ipm.my/?p=19049</guid>

					<description><![CDATA[<p>Great to have completed another successful joint building inspection with DBKL (Dewan Bandaraya Kuala Lumpur) officer and our client at the KLCC District Cooling Plant (DCC2). </p>
<p>The post <a href="https://ipm.my/joint-building-inspection-with-dbkl-officer-at-klcc-district-cooling-plant-dcc2/">Joint Building Inspection with DBKL Officer at KLCC District Cooling Plant (DCC2)</a> appeared first on <a href="https://ipm.my">IPM</a>.</p>
]]></description>
										<content:encoded><![CDATA[		<div data-elementor-type="wp-post" data-elementor-id="19049" class="elementor elementor-19049" data-elementor-settings="{&quot;ha_cmc_init_switcher&quot;:&quot;no&quot;}">
						<section class="elementor-section elementor-top-section elementor-element elementor-element-1fbb131b elementor-section-boxed elementor-section-height-default elementor-section-height-default" data-id="1fbb131b" data-element_type="section" data-e-type="section" data-settings="{&quot;_ha_eqh_enable&quot;:false}">
						<div class="elementor-container elementor-column-gap-default">
					<div class="elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-7fd739e8" data-id="7fd739e8" data-element_type="column" data-e-type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-d7728da elementor-widget elementor-widget-text-editor" data-id="d7728da" data-element_type="widget" data-e-type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
									<p>Great to have completed another successful joint <a href="https://ipm.my/3d-scanning/">building inspection</a> with DBKL <em>(Dewan Bandaraya Kuala Lumpur)</em> officer and our client at the KLCC District Cooling Plant (DCC2). A big thank you to the DBKL officer and our client for their cooperation and support throughout this inspection project. We are committed to delivering professional building inspection services to our clients in the building and construction industry, along with efficient liaison and submissions to local authorities.</p><p><em>To highlight: Under Street, Drainage and Building Act 1974: Section 85A, visual inspection is compulsory to be carried out for 10 years old tall building (exceeding 5 storeys), and the subsequent inspection shall be repeated in 10 years basis. The objective of the visual inspection is to assess the condition and performance of the building to ensure the building is safe to occupy for another 10 years. Therefore, the report will conclude the level of building safety.</em></p><p><em> </em><em>In common practice, the local authority (LA) will inform the building owner or management corporation by written notice. As soon as the notice is received, the building owner or management corporation has to engage the Professional Engineer with Practicing Certificate (PEPC) to carry out visual inspection for the building. Upon the completion of the inspection, a report will be prepared by PEPC and submitted to the LA within the stipulated time frame.</em></p><p><em> </em><em>The report will consist of the 5 main chapters, which include the introduction of the building, observation during the visual inspection, the root cause of defects, proposed rectification measures, and conclusion (safe or unsafe). If the PEPC in his opinion that the structural defect will likely endanger or reduce the structural integrity, then the PEPC shall recommend a full structural investigation (<a href="https://ipm.my/building-inspection/building-defect-assessment/">Building Defect Assessment</a>) to be carried out and it will be under the separate scope of services.</em></p>								</div>
				</div>
				<div class="elementor-element elementor-element-fcbada4 elementor-widget elementor-widget-ha-justified-gallery happy-addon ha-justified-gallery" data-id="fcbada4" data-element_type="widget" data-e-type="widget" data-settings="{&quot;row_height&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:150,&quot;sizes&quot;:[]},&quot;margins&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:10,&quot;sizes&quot;:[]},&quot;last_row&quot;:&quot;justify&quot;,&quot;enable_popup&quot;:&quot;yes&quot;}" data-widget_type="ha-justified-gallery.default">
				<div class="elementor-widget-container">
					
		<div class="ha-justified-grid__wrap hajs-justified-grid">
							<a href="#" data-mfp-src="https://ipm.my/wp-content/uploads/2025/03/Building-Inspection-Engineering-Consultant-02.jpeg" class="ha-justified-grid__item ha-js-lightbox __fltr-1" title="">
					<img fetchpriority="high" decoding="async" width="2392" height="2560" src="https://ipm.my/wp-content/uploads/2025/03/Building-Inspection-Engineering-Consultant-02.jpeg" class="elementor-animation-grow" alt="" srcset="https://ipm.my/wp-content/uploads/2025/03/Building-Inspection-Engineering-Consultant-02.jpeg 2392w, https://ipm.my/wp-content/uploads/2025/03/Building-Inspection-Engineering-Consultant-02-280x300.jpeg 280w, https://ipm.my/wp-content/uploads/2025/03/Building-Inspection-Engineering-Consultant-02-957x1024.jpeg 957w, https://ipm.my/wp-content/uploads/2025/03/Building-Inspection-Engineering-Consultant-02-768x822.jpeg 768w, https://ipm.my/wp-content/uploads/2025/03/Building-Inspection-Engineering-Consultant-02-1435x1536.jpeg 1435w, https://ipm.my/wp-content/uploads/2025/03/Building-Inspection-Engineering-Consultant-02-1914x2048.jpeg 1914w" sizes="(max-width: 2392px) 100vw, 2392px" />				</a>
							<a href="#" data-mfp-src="https://ipm.my/wp-content/uploads/2025/03/Building-Inspection-Engineering-Consultant-01.jpeg" class="ha-justified-grid__item ha-js-lightbox __fltr-1" title="">
					<img decoding="async" width="2560" height="1920" src="https://ipm.my/wp-content/uploads/2025/03/Building-Inspection-Engineering-Consultant-01.jpeg" class="elementor-animation-grow" alt="" srcset="https://ipm.my/wp-content/uploads/2025/03/Building-Inspection-Engineering-Consultant-01.jpeg 2560w, https://ipm.my/wp-content/uploads/2025/03/Building-Inspection-Engineering-Consultant-01-300x225.jpeg 300w, https://ipm.my/wp-content/uploads/2025/03/Building-Inspection-Engineering-Consultant-01-1024x768.jpeg 1024w, https://ipm.my/wp-content/uploads/2025/03/Building-Inspection-Engineering-Consultant-01-768x576.jpeg 768w, https://ipm.my/wp-content/uploads/2025/03/Building-Inspection-Engineering-Consultant-01-1536x1152.jpeg 1536w, https://ipm.my/wp-content/uploads/2025/03/Building-Inspection-Engineering-Consultant-01-2048x1536.jpeg 2048w" sizes="(max-width: 2560px) 100vw, 2560px" />				</a>
					</div>

						</div>
				</div>
				<div class="elementor-element elementor-element-058e5be elementor-align-center elementor-widget elementor-widget-button" data-id="058e5be" data-element_type="widget" data-e-type="widget" data-widget_type="button.default">
				<div class="elementor-widget-container">
									<div class="elementor-button-wrapper">
					<a class="elementor-button elementor-button-link elementor-size-md" href="https://ipm.my/bulletin/">
						<span class="elementor-button-content-wrapper">
									<span class="elementor-button-text">Back to  Bulletin</span>
					</span>
					</a>
				</div>
								</div>
				</div>
					</div>
		</div>
					</div>
		</section>
				</div>
		<p>The post <a href="https://ipm.my/joint-building-inspection-with-dbkl-officer-at-klcc-district-cooling-plant-dcc2/">Joint Building Inspection with DBKL Officer at KLCC District Cooling Plant (DCC2)</a> appeared first on <a href="https://ipm.my">IPM</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
